| 1 | Size the generator from the actual load profile | Prime power, standby power, motor starting current, and future load growth | Select the set after calculating running load, starting kVA, power factor, and site altitude. A practical planning allowance is 10%–20% spare capacity after the measured peak load. Avoid operating continuously below approximately 30% load where possible. | Oversizing increases capital cost and can reduce fuel efficiency at light load. Undersizing may cause overload trips, voltage dips, and shortened engine life. | High risk if motor starting and nonlinear loads are not tested. | Request a load schedule, motor-starting assessment, and a sizing calculation based on the actual site conditions. |
| 2 | Compare fuel consumption at several load points | Fuel rate, annual operating hours, fuel price, and expected load factor | Compare fuel consumption at 25%, 50%, 75%, and 100% load. For many diesel generator sets, fuel consumption is commonly around 0.21–0.30 litres per kWh, depending on rating, load, engine condition, and site conditions. | For 2,000 operating hours per year at 75% load and 0.25 litres per kWh, a 500 kW set would consume approximately 187,500 litres per year. | Medium risk when quotations show only one fuel-consumption point. | Use the same load profile and fuel price assumptions for every quotation, then calculate annual and five-year fuel cost. |
| 3 | Calculate total cost of ownership, not only purchase price | Equipment price, freight, duties, installation, fuel, service, parts, and residual value | Use a five-year model covering: purchase + logistics + installation + fuel + maintenance + major repairs − residual value. Fuel frequently represents the largest operating expense for heavily used sets. | A low initial price can be outweighed by higher fuel consumption, expensive filters, limited parts availability, or frequent service visits. | Medium risk if service intervals and spare-part prices are not documented. | Ask for a five-year cost worksheet with transparent assumptions and separate one-time and recurring costs. |
| 4 | Verify emissions and local compliance requirements | Emission limits, noise limits, electrical standards, fuel regulations, and import approvals | Requirements vary by country, application, and generator rating. Noise limits at property boundaries are often specified in dB(A), while emissions rules may require certified engine configurations or after-treatment systems. | Non-compliance can result in redesign, delayed commissioning, replacement components, fines, or restricted operation. | High risk for urban, healthcare, rental, and environmentally regulated projects. | Obtain written confirmation of applicable standards before placing the order and verify whether local testing is required. |
| 5 | Assess delivery time and logistics exposure | Production lead time, port transit, customs clearance, inland transport, and project buffer | International delivery may include several separate stages. A realistic project schedule should include customs and inland-delivery contingency rather than relying only on the factory dispatch date. | Delays can create site standby costs, temporary power rental, missed construction milestones, and storage or demurrage charges. | High risk when the project has no schedule float or alternative power source. | Request a milestone schedule, packing list, shipping documents, estimated arrival date, and a written delay-escalation process. |
| 6 | Check fuel quality, storage, and climate suitability | Fuel specification, ambient temperature, humidity, altitude, dust, corrosion, and storage duration | Site conditions can affect output and reliability. High altitude and high ambient temperature reduce available power, while long fuel-storage periods can increase contamination and fuel degradation. | Additional costs may include derating, larger radiators, fuel polishing, water separation, filtration, corrosion protection, and enclosure modifications. | High risk in tropical, coastal, desert, high-altitude, and remote locations. | Provide the supplier with altitude, maximum ambient temperature, humidity, air quality, and fuel-storage information before sizing. |
| 7 | Review maintenance intervals and service access | Oil changes, filter replacement, coolant checks, valve inspection, battery care, and major service | Routine service intervals are commonly based on operating hours and may fall around 250–500 hours, subject to the engine design, duty cycle, fuel quality, and operating environment. Time-based inspections may also be required even when annual running hours are low. | Labour, lubricants, filters, coolant, travel, lifting equipment, and downtime should be included in the maintenance budget. | Medium risk if the site has limited technical staff or difficult access. | Obtain a maintenance matrix showing tasks, intervals, parts, estimated labour hours, and required tools. |
| 8 | Confirm control, protection, and synchronization functions | Automatic transfer, remote monitoring, paralleling, load sharing, protections, and communications | Confirm compatibility with the facility distribution system and required functions such as overload, short-circuit, under/over-voltage, under/over-frequency, and emergency shutdown. | Missing controls can require additional panels, gateways, wiring, engineering, and commissioning after delivery. | High risk for parallel systems, data centres, hospitals, and critical infrastructure. | Approve a complete single-line diagram, control philosophy, interface list, and factory or site acceptance test plan. |
| 9 | Evaluate warranty coverage and parts availability | Warranty duration, exclusions, response time, local technicians, parts stock, and claim procedure | Compare warranty by months and operating hours. Check whether travel, labour, consumables, batteries, hoses, sensors, and consequential losses are excluded. | A longer warranty has limited value if parts require long international transit or if troubleshooting support is unavailable. | High risk for remote sites where a minor component failure can stop production. | Request a critical-spares list, local stock commitment, technical support contacts, and a documented warranty-claim workflow. |
| 10 | Plan testing, commissioning, and acceptance criteria | Factory testing, site testing, load-bank testing, documentation, training, and handover | A commissioning plan should define visual inspection, insulation and grounding checks, start-up tests, automatic transfer tests, alarms, protection settings, and load-bank verification. A controlled test should confirm stable operation at multiple load levels. | Proper testing reduces the likelihood of hidden installation defects, nuisance trips, poor load response, and premature component failures. | Medium risk, rising to high when the generator supports critical loads. | Include measurable acceptance criteria, test records, operator training, as-built drawings, manuals, and recommended spare parts in the contract. |