| Metering and proportioning system | Ask how the supplier controls and checks the ratio of the reactive components, including during startup, production, and shutdown. | The equipment can meet the selected material system’s specified ratio and tolerance, with documented calibration and ratio-check records. | Confirm the proposed ratio and allowable variation against the material supplier’s technical data and the part requirements. |
| Shot capacity and repeatability | Review the machine’s usable shot range and its ability to deliver the required shot size for the part and expected production cycle. | The target shot falls within the machine’s validated operating range, and repeatability is demonstrated with recorded production data. | Request a trial using the intended material and part geometry; agree on an acceptable shot-weight variation before the trial. |
| Mixing head and impingement mixing | Check that the mixing head is suitable for the material chemistry, shot size, viscosity, and required cleaning or purge method. | The supplier can explain how mix quality is monitored and can show stable molded-part results under the proposed process conditions. | Review sample parts and the planned mix-head setup; confirm compatibility with the material supplier’s processing guidance. |
| Material conditioning and temperature control | Assess storage, conditioning, circulation, and temperature monitoring for each component, along with controls for moisture-sensitive materials where applicable. | Temperature and material-handling practices are documented, monitored, and aligned with the selected material’s processing requirements. | Ask for process records and confirm how out-of-range conditions are detected and addressed. |
| Mold capacity and clamping arrangement | Verify platen dimensions, tie-bar or access clearances, mold thickness range, clamping capability, and the available space for the proposed tool. | The supplier checks the actual mold drawing and confirms machine fit, safe access, and adequate clamping for the planned process. | Request a documented machine-and-mold compatibility review before tooling or production approval. |
| Process monitoring and traceability | Ask which process variables are recorded, such as component temperatures, pressures, shot settings, cycle times, and alarms. | Critical settings are controlled and recorded, with traceability linking production lots to material batches and process records. | Review a sample production record and confirm data retention and access arrangements. |
| Tool temperature and cure management | Determine how mold temperature is controlled and how the supplier establishes demold time and cure conditions for the selected material and part. | The supplier develops a documented process window through trials rather than relying on unverified settings from unrelated applications. | Ask for trial plans and acceptance criteria covering dimensions, surface quality, and any required physical properties. |
| Venting, filling, and defect troubleshooting | Discuss how the supplier addresses air entrapment, incomplete filling, voids, flash, and surface defects through part, tool, and process design. | Technical staff can identify likely causes, propose controlled corrective trials, and document outcomes. | Use a representative part or prior non-confidential case study to assess the troubleshooting approach. |
| Maintenance and calibration | Review preventive maintenance for pumps, seals, filters, hoses, mixing heads, temperature controls, and measurement equipment. | Maintenance and calibration activities are scheduled, recorded, and linked to defined checks or acceptance limits. | Request redacted maintenance and calibration records for the equipment proposed for the project. |
| Engineering and scale-up expertise | Evaluate experience with the relevant material family, part geometry, production volume, and quality requirements. | The team can explain design-for-manufacturing considerations, trial stages, process validation, and how production settings will be transferred or maintained. | Hold a technical review with both process and quality personnel; record open risks and agreed actions. |
| Decision note | Compare suppliers using the same part, material, acceptance criteria, and evidence requirements. Confirm all process limits with the material and equipment documentation. |