| 1 | Fixture repeatability | Positioning repeatability under the intended loading, clamping, and production conditions. | Repeatability test report, measurement method, sample size, and test conditions. | Compare measured results with the drawing and process requirements. |
| 2 | Datum and locating strategy | How the fixture establishes datums and locates parts while accounting for part variation. | Fixture layout, datum scheme, locator specifications, and tolerance stack-up review. | Check that locating points are clear, accessible, and consistent with the part design. |
| 3 | Inspection and calibration | Methods used to verify fixture geometry and maintain measurement traceability. | Inspection records, calibration certificates where applicable, and measurement-equipment list. | Confirm that inspection methods match the required tolerances. |
| 4 | Weld distortion control | Support, clamping sequence, access, and design provisions intended to manage heat-related distortion. | Weld sequence proposal, process review, trial-build findings, and adjustment plan. | Review against the part material, joint design, and welding process. |
| 5 | Automation readiness | Compatibility with robots, sensors, safety systems, and the intended production cycle. | Interface drawings, I/O list, robot-access study, and automation scope definition. | Verify interfaces and responsibilities before design approval. |
| 6 | Clamping and sensing | Clamp type, clamp-state confirmation, part-presence detection, and error-proofing provisions. | Pneumatic or electrical schematics, sensor list, and control sequence description. | Assess safe operation, fault detection, and ease of troubleshooting. |
| 7 | Build and acceptance process | Design reviews, tryout stages, acceptance criteria, and handling of identified issues. | Project schedule, acceptance checklist, inspection plan, and issue-resolution procedure. | Agree on measurable acceptance criteria before purchase. |
| 8 | Documentation and change control | Completeness of drawings, bills of materials, operating instructions, and revision management. | Sample documentation package and documented engineering-change process. | Check that records support maintenance and future modifications. |
| 9 | After-sales response | Availability of technical support, response channels, spare parts, and on-site service terms. | Written service-level terms, support hours, escalation path, and spare-parts policy. | Compare commitments in writing rather than relying on verbal assurances. |
| 10 | Total cost and delivery risk | Tooling price, engineering scope, shipping, installation, training, spare parts, and schedule assumptions. | Itemized quotation, delivery milestones, exclusions, warranty terms, and payment schedule. | Compare quotations on the same technical scope and acceptance basis. |